1.Before finishing any basement project, check for moisture issues - leaks,
excessive moisture, mold/musty spots, staining on concrete, bugs & spiders
that thrive in damp areas, foundation cracks, window leaks, exterior
drainage issues etc.
2.Remove any existing flooring material that will trap, block or absorb
moisture such as vinyl, carpet or wood flooring. If you have asbestos tile,
see the Environmental Protection Agency website for details.
3.Make repairs, fill cracks and seal concrete where necessary.
4.For any low spots in the floor greater than 1/4", level with self-leveling
liquid compound. This is most important if installing a wood floor finish.
5.Determine the quantity of subfloor panels, leveling kits, and 1/4" spacer
material for the project. For subfloor panel quantities, take the square
footage of your room and divide by 3.3. This equals the number of subfloor
panels required.
6.Prepare tools and materials necessary to install the subfloor panels (see
the "Things You'll Need" section below).
7.Acclimatize the subfloor panels and wood flooring if applicable, to the
temperature and humidity in the room where they will be installed.
8.Sweep or vacuum floor to ensure a smooth surface.
9.Install 1/4" temporary spacers along wall edges.
10.Start at the longest wall and pre-measure the length and width of the
floor area to ensure the last panel pieces in each row end are greater than
6" in width. Measure to include the ¼ spacer material. Adjust the starting
panel of each row to accommodate for the end of row panel width.
11.Cut panels and spacer material outside or in a well ventilated garage.
12.Check your starting corner for squareness. If your starting corner is not
at a 90-degree angle into the room, then the wall edge of your first row of
panels will require cutting.
13.In your starting corner, lay the first panel with the groove sides flat
against the 1/4" spacer material.
14.Slide the next panel against the starting panel by press-fitting the
groove of the second panel into the tongue of the first panel tightly in
place.
15.Use a tapping block and hammer to ensure a snug fit. Repeat until the row
is complete.
16.Cut the last panel of the row to fit into place, allowing for the 1/4"
gap. Use the pull bar to pull the last panel into place.
17.Cut an opening the size of the inside measurements of the register cover
into 1 panel every 10’ in panels that line exterior wall edges, to allow for
airflow. Allow for 6�? away from the wall side edge of the panel to start
this opening.
18.Check each row for leveling and use leveling shims where required.
19.Stagger panel seams of alternating rows by using off-cuts from previous
rows as starting panels for these rows.
20.Rows #1 and #3 look the same. Alternating rows #2 and #4 are staggered.
21.Only work with 2 rows at a time. This will make adjusting panels or
shimming for leveling easier.
22.Continue to install panels, staggering seams until the room is completed.
Leave 1/4" spacing for pipes, stairs or other affixed obstacles in the room.
23.Finish with your choice of finished flooring including openings for the
vent covers.
24.Install vent covers in the openings along outside wall edges every 10'.
25.Remove temporary spacers.
•Installing an air gap subfloor with subfloor panels will help to control
moisture from concrete floors that may contribute to mold formation.
•Regulating humidity between 30-50% and room temperature at 71oF/20oC will
help maintain warranty conditions and control moisture.
•You can increase airflow to control moisture easily by increasing the space
between subfloor panels and the wall edge. Running air duct vents down wall
cavities to the floor level and forcing air underneath the air gap subfloor
panels controls moisture.
•Installing walls on top of the subfloor panels lifts the wall and floor
away from damp concrete surfaces.
•Only install finished flooring approved for basements.
•If you get water - drill a 2.5 inch hole in center of panel at the lowest
spot in installation using a plug cutter. Insert the 2.5 inch hose of a
shop-vac into hole (apply tape (masking,duct) around tube end for tight
seal)and vacuum water out. Re-insert plug when finished and remember/mark
it's position.
Custom Basement Remodeling Services
At Basement NJ. we pride
ourselves in offering the finest craftsmanship combined with knowledgeable
and personalized service in all phases of your remodel.
Our Services include:
Basement Remodeling | Theater Rooms | Basement Bar | Electrical
| Flooring | Lighting | Windows | Tile & Stone
| Showers |
Plumbing | Water Damage Repair
Basement
NJ Remodeling Proudly Serving
Butler NJ | Bridgewater NJ | Boonton Twp NJ | Clifton NJ |
Chatham NJ | Chester NJ | Dumont NJ |
Florham Park NJ| Kinnelon NJ | Lincoln Park NJ | Madison NJ | Mendham NJ
| Morris Plains NJ | Mount Arlington NJ | Mountain Lakes NJ | Netcong NJ | Rutherford NJ |
Rockaway NJ | Riverdale NJ | Victory Gardens NJ | Wharton NJ | Boonton
NJ | Dover NJ | Morristown NJ | Boonton NJ | Chatham NJ| Chester NJ |
Denville NJ | East Hanover NJ | Hanover NJ | Harding NJ | Jefferson NJ |
Long Hill NJ | Morris Plains NJ | Mendham NJ | Midland Park NJ | Mine Hill
NJ | Montville NJ | Mount Olive NJ | Morris NJ | Morristown NJ |
Parsippany NJ | Pequannock NJ | Randolph NJ | Rockaway NJ | Roxbury NJ |
Washington NJ | Budd Lake NJ | Cedar Knolls NJ | Cedar Lake NJ | Convent
Station NJ | Flanders NJ | Milford
NJ |
Montclair NJ |Green Village NJ | Lake Swannanoa NJ | Lake Telemark NJ |
Long Valley NJ | New Vernon NJ |Orange NJ | Port Morris NJ | South
Orange NJ | Somerville NJ | South Plainfield NJ |
Succasunna-Kenvil NJ | Sparta NJ |
Towaco NJ | Wayne NJ |
West Orange NJ | Whippany NJ | White Meadow Lake NJ | White
Whitehouse NJ |
Morris County
|
Sussex
County |
Essex
County |
Bergen County |
Hunterdon County |
Passaic County |
Somerset County |
Union
County |
Warren County |
Hudson County
Updated 2/05/2012 11:22:12 AM
Residential Remodelers. LLC
Please contact us with any questions 908-750-5065 Tony Charles
Long Valley, New Jersey 07853
Privacy Policy SITE
MAP
|